Holiday closure: 27/3- 14/4/2024.

Help: Flush Ceiling Rose Assembly

BLUE: Small screw hold the earthing wire.
PINK: Allthread holds the cable clamp & bracket.
GREEN: Use your own screws in these holes. (screw type will be dependent on your ceiling material).

Assembly instructions can be downloaded on the product page.

A video tutorial of how to install ceiling roses can be found on our Youtube channel.

Posted on 2023-09-29 FAQ

Menu